Threshold of Success

The threshold of success (ToS) is the set of criteria, agreed and written down in advance, that decide whether a project succeeded — stated in terms of product, process and people [1]. It is written before the work starts, and it is what every later argument about “was this a success?” is settled against.

1. Write the failure statements first, then invert them

Goal statements resist precision; failure statements do not. The practical route to a threshold is therefore backwards:

  1. Gather the stakeholders who will be affected — customer, users, sponsor, team.
  2. Write what failure looks like, plainly: “the migration ran past the December close”, “support tickets doubled in the first month”.
  3. Invert each statement into a positive criterion: “cutover complete before 1 December”, “support volume within 20% of the pre-migration baseline after 30 days”.
  4. Check each one is SMART — specific, measurable, assignable, realistic, time-bound. The criteria are Doran’s, from 1981, relayed by Wysocki [2]; note that the A is assignable, naming who is responsible, not “achievable”.

Concerns above and below the threshold line Above the line it is a risk; below it, an event. [1]

2. The test that makes a criterion a criterion

Wysocki states the standard in one sentence [2]: “An ideal statement will have only two results — the criteria were met or the criteria were not met. There can be no in-between answer here.”

Applied to a real threshold, the test is quick. For example, “the reporting module will be easy to use” fails — two honest people reading the same evidence could disagree. “A new branch administrator completes the month-end reconciliation report unaided, in under 15 minutes, on first attempt” passes, because it can only come out one way.

Wysocki adds a constraint that is more useful than it looks: a business success criterion reduces to increased revenue, reduced cost or improved service. A criterion that reduces to none of the three — “we delivered 47 stories” — is measuring the project, not its purpose. Improved service usually needs a proxy measure, agreed with the sponsor before the project rather than at the review.

3. Agreeing it: a conversation with a stopping rule

The threshold lives inside a protocol Wysocki calls Conditions of Satisfaction, and the stopping rule is the point: the loop ends when neither side corrects the other.

Request, clarify, respond, clarify — repeated until it stops moving The restatement is the test. [2] Its deliverable is a one-page Project Overview Statement carrying

the problem, one goal in the language of the business, objectives, success criteria and assumptions.

The agreement is not an artefact you file. It is re-run at every milestone, and on a change of sponsor or project manager — exactly when a project silently changes what success means without anyone noticing.

4. Why risk management starts here

The threshold is also the instrument that makes risk identification finite [1]: “The ToS serves as a catalyst in identifying risks that, if they were to materialize, might prevent the project from being successful.”

Without it, every conceivable bad event is a candidate and the register grows until nobody reads it. Wysocki supplies the other bound: an event you are certain of is not a risk but a certainty. See risk identification.

5. Limitations and challenges

  • Agreement is hard. Stakeholders bring differing priorities and hidden assumptions, and thresholds are where those surface — the point of the exercise, but it costs time.
  • Thresholds conflict. High quality, low cost, fast delivery and broad scope cannot all be maximised; see expectation space.
  • Both extremes destroy credibility. Set them too low and they are meaningless; too high and they are unachievable.
  • Real change forces renegotiation. A threshold defended past the point where it made sense is the same failure as having none.
  • It assumes there is a goal to agree on. Wysocki is explicit that the method “loses its value as the goal becomes more and more elusive” — on genuinely exploratory work, expect to re-run it rather than to get it right once.

How solid is this?

  • Where it comes from. Hoover, Rosso-Llopart and Taran is a software textbook built on case studies; Wysocki is a practitioner handbook. Both establish method, neither measures whether defining a threshold improves outcomes.
  • What is contested. Nothing in the method — but the Conditions of Satisfaction dialogue is worked through a manufacturing scenario in the source, so the software reading above is ours.
  • What we do not hold. Wysocki’s project-failure statistics are asserted with no source, and the same ten-item list appears in his book once as success factors and once as failure factors. None of it is used here.

Acknowledgments

This page adapts material from lectures by Eduardo Miranda, David Root and Gil Taran [3] on software project management.

References

  1. C. L. Hoover, M. Rosso-Llopart, and G. Taran,
    Evaluating Project Decisions: Case Studies in Software Engineering. Addison-Wesley Professional, 2010. [Online]. Available: https://www.oreilly.com/library/view/evaluating-project-decisions/9780321685629/
  2. R. K. Wysocki and R. McGary,
    Effective Project Management: Traditional, Adaptive, Extreme, 3rd ed. Wiley Publishing, 2003.
  3. D. Root,
    Managing Software Development. Carnegie Mellon University / Innopolis University lecture series, 2014.

Disclaimer: AI is used for text summarization, polishing and explaining. Authors have verified all facts and claims. In case of an error, feel free to file an issue.


This site uses Just the Docs, a documentation theme for Jekyll.